The Municipality Building and the Adem Jashari Cultural Center in Istog are the next projects that will benefit from the third package of investments in energy efficiency measures from the Kosovo Energy Efficiency Fund.
The measures that will be implemented in these two facilities include: thermal insulation of the building envelope (thermal insulation of walls, efficient windows and roof insulation), replacement of the existing boiler with efficient one, the cleaning of the pipe network, the installation of dynamic thermostatic valves ensuring internal temperatures according to the required norms, as well as the electrical works that include the change of inefficient lighting bodies to efficient ones (LED). These investments amount to more than 580 thousand euros and it is intended that through them to be saved about 370 MWh per year or about 60% of the total consumption of these two buildings, while the works are expected to be completed within this year.
We thank the municipality of Istog for their cooperation, as well as our donors: the EU Office in Kosovo, the World Bank and the Government of the Republic of Kosovo for their support and funding.