Eqrem Qabej Lower Secondary School

Municipality: Mitrovica
Project type: School
Investment value: €204,550.59
Year: 01/05/2023
Area: 2,163.00
Status: Përfunduar
Electricity consumption before implementation of EE measures: KWh/vit: 492,142.71 MWh/vit: 492.14
Electricity consumption after implementation of EE measures: KWh/vit: 200,903.54 MWh/vit: 200.90
Electricity savings after implementation of EE measures: KWh/vit: 409,674.00 MWh/vit: 409.67
Number of users of the building: 1,119
Savings percentage: 83%
CO₂ reduction (tons/year): 185.8

Implemented Measures

  1. Thermal insulation of walls

  2. Thermal insulation of the roof

  3. Replacement of lighting with efficient LED lighting

  4. Replacement of doors and windows

  5. New pellet boiler

  6. Renovation of the heating network